Half the time. A tenth of the cost. One unanimous go.
- AI – Driven Organization
- Manufacturing
How a control-room manufacturer turned its most error-prone production process into a digital twin — with AI where it helps, and determinism where compliance demands it.

Proof point
What we delivered
- Weeks from kickoff to a unanimous go
- 15
- Requirements agreed line by line with practitioners
- 34
- Person core team, AI-augmented
- 2
- Proof-of-concept match on a real reference project
- 100%
“The process takes half the time it used to.”

Marcel Beck
Tech Lead
The situation
Why a core process still ran on copy-paste
A German manufacturer of control-room solutions documents every customer installation through a chain of documents radiating from one schematic: device lists, IP plans, infrastructure and patch-cable planning, parts lists. Every arrow in that chain was a manual, error-prone copy-paste — and a miscount meant rework on the construction site.
The challenge
Digitalizing without breaking what works
Digitalize the process without breaking what works. The workforce ran on tools that, however painful, delivered — and an attempt to enrich data inside the drawing tool a decade earlier had failed and was still remembered. Customer schematics could not leave the company, so a “just send it to an LLM” shortcut was off the table from day one.
Our approach
How we make a core process AI-driven
Process first, tool second
Process first, tool second: workshops with the practitioners mapped the full asset lifecycle, data ownership and every hand-off before a single requirement was written.
Digital twin as source of truth
A digital twin as the single source of truth — one authoritative record per installation; the hand-maintained lists become generated outputs, never re-typed.
AI + human validation
AI-assisted extraction with human validation: the tool reads the schematic and generates the device list — deliberately deterministic and offline for the compliance-critical step (GDPR / ISO 27001), with AI enrichment as a later increment.
Change management
Change management as a workstream, not a footnote: requirements-first, a change-ready pilot department as beachhead, MVP instead of big-bang, and a go decision deliberately postponed until the requirements were mature.
AI-augmented team
A small AI-augmented delivery team, building on the client's own infrastructure — so a hand-off to the client remains possible at any time.
The result
The process now takes half the time — a 50% efficiency gain in a core production workflow. The economics held up too: the custom build cost about 65% less than one year of a comparable SaaS fee, roughly 90% less over three years, and the client owns it outright on its own infrastructure. The go decision was unanimous; further departments are already named as follow-on increments.
How healthy is your transformation?
Twenty questions, five minutes, an immediate score across twelve dimensions. No registration to see your result.